Skip to content

ISO 27001 Readiness

A customer has asked for your ISO 27001 certificate, and you do not have one.

Assurance & ComplianceCertification readiness
01

Fee

Register to see indicative feesConfirmed in writing after scoping
02

Typical duration

16 to 24 weeksDepends on scope, existing documentation and evidence maturity
03

Primary artefact

Audit-ready ISMS with an Annex A evidence packPlus four more
04

Who leads it

Steve SharmaFounder & Principal
Led by an ISO/IEC 27001 Lead Auditor

What ISO 27001 Readiness is

ISO/IEC 27001 is the international standard for information security management systems. This service prepares your organisation to be certified against it by an accredited certification body.

And what this service produces

It produces an operating ISMS (scope, risk method, policies, Annex A controls, internal audit and management review) and the evidence pack a stage-1 and stage-2 audit expects to find.

Built for a real assurance trigger, not a badge project.

01

This fits when

  • Your customers or tenders require certification.
  • You have committed to a certification date.
  • You sell into enterprise or government.
  • Your ISMS exists on paper but has never been audited.
02

The usual trigger

  • A customer contract or tender requires the certificate.
  • An enterprise deal is blocked on it.
  • The board has set a certification target.
  • A previous attempt stalled.

What the standard actually requires, and where readiness programmes stall

ISO 27001 is a management-system standard, not a control checklist. The controls in Annex A matter, but the clauses are what an auditor tests, and the clauses require a system that has been operating, not one that has been documented.

Most organisations do not struggle with the decision to certify. They struggle with scope definition, with interpreting requirements against an estate that changes, with building evidence an auditor will accept, and with the two clauses that cannot be shortcut.

04

Scope

Which parts of the organisation, which systems, which locations. The most consequential decision in the programme and the one most often revisited too late.

06

Risk and the Statement of Applicability

Risk assessment and treatment, and the Statement of Applicability. The SoA is the document an auditor reads first.

08

Operational planning and control

Evidence that the controls are actually operating.

09

Monitoring, internal audit and management review

The most common stage-2 finding, because it requires the system to have been running for a period.

A

Annex A controls

93 controls across organisational, people, physical and technological themes. Exclusions are permitted but must be justified in the SoA.

An auditor does not ask whether your policies are good. They ask whether the system decided something, did it, checked it, and recorded what it found.

Five artefacts. Each one yours to keep.

  • 01

    ISMS documentation set

    Scope, policies, procedures and the Statement of Applicability, written for your organisation.

    Document setISMS owner
  • 02

    Annex A control gap register

    All 93 controls, current state, gap, and what closes it, prioritised and effort-estimated.

    RegisterSecurity and IT
  • 03

    Risk assessment and treatment plan

    A repeatable risk method, applied, with the treatment plan an auditor expects.

    Method + registerRisk owner
  • 04

    Internal audit programme and first audit

    Schedule, checklists and one completed internal audit against the standard.

    Audit reportManagement review
  • 05

    Certification-body liaison

    We prepare the submission, attend stage 1, and manage findings through to stage 2.

    Named activityThrough certification

The whole system is visible before work begins.

01

Scope and context

  • ISMS scope defined and justified
  • Interested parties and requirements
  • Boundaries and exclusions
02

Risk

  • Risk assessment method
  • Risk register and treatment plan
  • Statement of Applicability
03

Documentation

  • Information security policy and supporting procedures
  • Records and retention
  • Document control
04

Annex A controls

  • All 93 controls assessed
  • Gap closure design
  • Justified exclusions documented
05

Assurance

  • Internal audit programme
  • First internal audit
  • Management review
06

Certification support

  • Stage-1 readiness review
  • Submission pack
  • Stage-2 finding management

A useful boundary is part of the deliverable.

Included

  • ISMS scope and organisational context
  • Risk assessment, treatment and the Statement of Applicability
  • ISMS documentation and document control
  • Assessment of all 93 Annex A controls and gap closure design
  • Internal audit and management review
  • Stage-1 and stage-2 certification support

Not included

  • The certificate: Certification is issued by an accredited certification body following their audit. We are not one.
  • Certification-body fees: Billed directly by the certification body, not included here.
  • Control implementation: Where a gap requires building something, we design and specify. Building it is your team or separate work.
  • Ongoing ISMS operation: We hand over an operating system and a named owner. Running it is yours, or a separate retainer.
  • Penetration testing: Where the SoA requires testing, that is scoped separately.

A traceable path from scope to evidence.

01

Scoping and gap assessment

Scope defined, then every clause and all 93 Annex A controls assessed against current reality.

Produces The gap register
02

Risk and SoA

Risk method built and applied; Statement of Applicability drafted with exclusions justified.

Produces Risk register + SoA
03

Documentation and control design

Policies, procedures and the control designs that close the register.

Produces ISMS documentation set
04

Implementation support

Your team operates the ISMS while we support and evidence. This phase cannot be compressed.

Produces Operating records
05

Internal audit and management review

First internal audit run, management review facilitated, findings closed.

Produces Audit report + minutes
06

Certification support

Stage-1 readiness, submission and stage-2 finding management.

Produces Certification-ready submission
Mapped againstISO/IEC 27001ISO/IEC 27002ISO/IEC 27005NIST Cybersecurity Framework

16 to 24 weeks of work.

Elapsed time and customer effort are separated because they are not the same number.

Weeks 1 to 4

Scoping and gap assessment

Define the scope, then assess every clause and all 93 Annex A controls against current reality.

Customer effort

Two half-day workshops, plus system and documentation access.

Weeks 5 to 8

Risk method, register and SoA

Build and apply the risk method, and draft the Statement of Applicability with exclusions justified.

Customer effort

One workshop plus four to six interviews.

Weeks 9 to 14

Documentation and control design

Write the policies, procedures and control designs that close the register.

Customer effort

Review cycles, roughly five to eight hours a week from the ISMS owner.

Weeks 15 to 22

Implementation support, internal audit, management review

Your team operates the ISMS while we support and evidence, then the first internal audit and management review are run.

Customer effort

Your team operates the ISMS; one management review session.

External

Stage-1 audit

Scheduled by the certification body, typically two to four weeks after readiness.

Customer effort

Certification-body timing; not controlled by us.

External

Stage-2 audit

Typically four to eight weeks after stage 1. Our work runs 16 to 24 weeks; the full path to a certificate is usually 8 to 12 months, because an auditor must see the ISMS operating, not merely documented.

Customer effort

Certification-body timing; not controlled by us.

Our work: 16 to 24 weeks

Test whether ISO 27001 Readiness
is the right next move.

We will cover likely scope, cost and fit.

Book a confidential strategy sessionWith Steve Sharma, who would lead.

Named lead. Direct assessment.

Portrait of Steve Sharma
Your ISO 27001 engagement lead

Steve Sharma

Founder & Principal

Runs the gap assessment, drafts the SoA, and attends both certification audits.

ISO/IEC 27001 Lead AuditorASD-endorsed IRAP AssessorCISSP

Every engagement has a named lead. Where a second executive or specialist is needed, they are named in the proposal and subject to client approval.

Review leadership record

Three decisions.
Accountability.

01

The clause map is published before you engage.

You can check whether we understand the standard before paying us anything.

02

We prepare, and we say who certifies.

The boundary is stated on the page, not discovered in the closing meeting.

03

The ISMS is built to be run by your team.

Every deliverable names the internal owner it hands to, with documented handover so the system does not depend on us.

What this engagement does not claim.

01
Certification

We prepare organisations. We do not certify our own work.

We prepare organisations for assessment and certification, but we do not certify our own work. Accredited certification bodies certify, and we never sit on both sides of that line.

02
Operations

We are not a managed security service.

We do not run your SOC or monitor your environment.

03
Engineering

We design and specify. Building is separate.

Where a gap requires building something, we design and specify it. Building it is your team or separate work.

04
Frameworks

One ISMS, mapped across four references.

The work maps to ISO/IEC 27001, ISO/IEC 27002, ISO/IEC 27005 and the NIST Cybersecurity Framework.

From · confirmed in writing after scoping

Register to see indicative fees

Price your scope

What moves the fee

+Increases the fee

Per additional site or major system group inside the ISMS scope.

−Reduces the fee

Where policies and records already exist.

+Increases the fee

Where records must be reconstructed to evidence the controls.

Fixed-fee phases from a stated starting pointStarting fee confirmed in writing after scopingCertification-body fees excluded and billed by them directly

Where this sits in the wider programme.

Sometimes the best recommendation is a smaller service, or a later date.

The questions that change the decision.

Our work runs 16 to 24 weeks; the full path is usually 8 to 12 months. The audit windows belong to the certification body and the ISMS must be seen operating. Anyone promising a certificate in three months is describing documentation, not certification.

If ISO 27001 Readiness is what you need, the next step is a conversation about scope.

A 45-minute conversation about what your scope actually looks like, what it would cost, and whether this is the right service for you at all. With Steve Sharma, who would lead the engagement.

Book a confidential strategy sessionFree AI Risk Self-AssessmentView pricing